Start-up/ Commissioning/ Acceptance Testing
The vast majority of equipment failures can be attributed to inadequate system design, improper coordination and calibration of protective devices, wiring errors or other commissioning deficiencies. These failures and subsequent outages can be drastically diminished through a comprehensive acceptance testing program, performed by a qualified testing company that is familiar and experienced with all phases of the commissioning process.
At HMT, our highly trained project engineers and technicians possess the knowledge, experience and technical expertise necessary to ensure that your newly installed system is energized in a manner that is consistent with its design, safety, and operational specifications. HMT has performed start-up, commissioning, and acceptance testing for a wide range of projects.
Our integrated Acceptance Testing approach features:
• Commissioning Plan Development
• Project Design Review
• Acceptance Testing and Calibration
• Verification of Proper Equipment Installation
• Verification of Proper Operation
• Introduction of System Safety Methodology
• Energization of Electrical System
• Ongoing Maintenance
• Initial training for facility personnel relevant to new equipment operation
The inspection and testing performed on an electrical power system prior to initial energization, is potentially the most critical preventive maintenance that the system will receive within its functional life cycle. By choosing HMT, you are relying on respected industry experts that possess the experience, resources, and the proper equipment necessary to satisfy the critical aspects associated with the energization of your system. |